Skip to content

Concept site by Web Masonry: not a real business. webmasonry.dev

Bright Line Electric, home

EV charger installation

A Level 2 charger adds roughly a full day's driving overnight. We install it on its own circuit, pull the permit, and stay until the inspector signs it off.

From $1,200 standard run, permit included

What it costs

The price, line by line

EV charger installation costs
ItemStatusPrice
Level 2 charger install, standard runIncludedFrom $1,200
Permit and inspectionIncluded—
Longer cable run or trenchingQuoted on site[PRICE]
Panel upgrade, if your panel is fullOnly if neededFrom $2,800
The charger itselfYours, or we supply one[PRICE]

How it goes

From quote to charging

  1. Site visit and written quote

    We check your panel's spare capacity and measure the run. You get the price and the timeline in writing.

  2. Permit and install

    We file the permit, then install the circuit and charger in a day on most homes.

  3. Inspection and handover

    The inspector signs it off. We show you the breaker and how to set charging times.

EV charger questions

Do I need a panel upgrade for an EV charger?

Not always. Many 200-amp panels have room. A full or 100-amp panel may need a load calculation, a load-sharing device or an upgrade. We check before we quote.

Can I buy my own charger?

Yes. If it's a listed Level 2 charger we'll install it. We can also supply one.

Indoor or outdoor?

Either. Outdoor installs use a weather-rated charger and box.

How long does the whole thing take?

[TIMELINE] from quote to inspection, most of it waiting for the permit. The install itself is usually one day.

All questions

A recent EV charger job

EV chargers[TOWN] · Completed [DATE]

Level 2 charger, detached garage

A 40-foot trench to a detached garage and a 48-amp charger on its own circuit. Permit, install and inspection in [TIMELINE].

Ready for a charger?

Send a photo of your panel and where you park. We'll tell you if it needs anything else before we quote.

Call (555) 010-0500